Digital editionNovember 20, 2026
Structure Magazine
Roofing

When the Roof Becomes the Room

The timber canopy at Centre Pompidou-Metz makes visible what exposed roofs often demand behind the scenes. Structure, enclosure and services need to be designed together.

Exposed steel roof trusses seen from below in black and white.
The repeating trusses set the rhythm of the room below. · KC Shum / Unsplash

At Centre Pompidou-Metz, a visitor can see the roof from the public forum and the park. It stretches across a cluster of spaces, while three galleries pass through the building in long rectangular volumes. The museum describes a lattice of glue-laminated timber made from hexagonal modules, spanning about 40 meters in places. A white fiberglass membrane coated with PTFE covers the lattice and admits diffuse light. The roof does much of the work of making the separate galleries read as one building. Centre Pompidou-Metz’s architectural account

An ordinary building with its roof structure exposed faces a related problem at a smaller scale. The distance from the floor to the deck, the intervals between structural members and the places where light enters all become part of the architecture. So do the obstructions that a dropped ceiling would usually conceal. A duct crossing a row of trusses creates a deep line in the room. The underside of a drain or a change in the deck profile can become a permanent point of reference. The museum offers a spatial precedent. Its membrane and lattice are a particular solution, with little to say about the correct assembly for a new office or house. Shigeru Ban Architects’ project description

The ceiling plan and the roof section tell different stories

In a conditioned building, the roof is part of the enclosure. Its bulk-water, air and thermal control layers have to work at junctions as well as in a typical bay. A parapet may connect an air-control membrane at the roof to a different material in the wall. That connection should be possible to assemble before adjacent trades close off access. Drawings that show a continuous line in section still need to make clear what actually crosses the junction and which trade can reach it. The Whole Building Design Guide treats the air barrier as an interconnected assembly, with continuity and support that extend across transitions. WBDG guidance on air barrier systems

Air control and vapor control are separate functions. Air can carry moisture through a gap when pressure drives it across the assembly. Vapor can also move through materials by diffusion. A choice about how a particular roof can dry depends on climate, material layers and interior conditions. Research on unvented conditioned attics provides one example of deliberately moving the enclosure to the roofline. That assembly has specific design conditions. An exposed roof deck by itself tells the reader little about what those layers should be. DOE Building America’s work on unvented conditioned attics

Below the deck, a service route has a visible depth. Small branches can often sit among structural members, while a large duct may need to cross beneath them. Cable trays need room to be worked on. A structure designed for the roof loads still needs an engineered basis for equipment supports. Coordinating those points in section gives the team a chance to group elements that cross the bays and keep common service points reachable.

A similar distinction applies to sound. The open volume and any hard, reflective surfaces influence how speech and activity carry. Occupants may care as much about what they can hear as what they can see overhead. Treatments have a place in the architectural section alongside lighting and structure. Their location needs to leave room for the equipment they sit beside.

A finished room with a record above it

The underside of the roof may be exposed while the most consequential construction remains concealed. Photographs at a parapet, curb or penetration can record how the control layers were connected before they disappear. Approved roof plans and records of service supports help the next team understand what can be altered during a fit-out or reroof. Such records are worth planning around the construction sequence. Once the layers are covered, the visible ceiling cannot explain them.

The lesson from making a roof the room is that exposed construction gives fewer opportunities to defer decisions. A roof can still be the most memorable part of the building. Its architectural presence is more likely to survive construction when the interior services and the exterior enclosure are treated as part of the same design.

Illustrative lead image. KC Shum · Lead image on Unsplash